Generic Knowledge Test: Answers

Thank you for completing the Generic Knowledge Test.

Use the questions and answers below to review your results and identify any areas where additional revision may be beneficial

1. What is the primary purpose of the waste hierarchy?

A. To increase landfill use
B. To prioritise waste prevention and recovery ✅
C. To reduce transport costs
D. To classify hazardous waste

2. Which of the following is the third stage of the waste hierarchy?

A. Disposal
B. Recycling ✅
C. Prevention
D. Recovery

3. Which legislation is the main framework for environmental permitting in England?

A. Environmental Protection Act 1990
B. Waste Framework Directive
C. Environmental Permitting Regulations ✅
D. Health and Safety at Work Act

4. What does LoW stand for?

A. Level of Waste
B. List of Waste ✅
C. Law of Waste
D. Licence of Waste

5. When selecting a LoW code, what should you do?

A. Pick the closest match quickly
B. Always use a 99 code
C. Consider the full list and process ✅
D. Ask a colleague

6. Which organisation enforces environmental permits in England?

A. HSE
B. DEFRA
C. Environment Agency ✅
D. Local Authority only

7. What is the minimum capacity for secondary containment?

A. 100% of largest container
B. 110% of largest container or 25% total volume ✅
C. 50% of total volume
D. Equal to total volume

8. What colour are foul water drains typically marked?

A. Blue
B. Red ✅
C. Yellow
D. Green

9. What is a ‘bespoke permit’?

A. A permit for temporary use
B. A standard rules permit
C. A permit tailored to site-specific risks ✅
D. A transferable permit

10. Which of the following is hazardous waste?

A. Clean cardboard
B. Food waste
C. Solvent-contaminated packaging ✅
D. Green waste

11. A mirror entry waste contains a small amount of hazardous substance below threshold. How should it be classified?

A. As hazardous
B. As non-hazardous
C. Depends on concentration thresholds and assessment ✅
D. Based on operator preference

12. A waste transfer station receives mixed loads with visible contamination. What is the operator’s responsibility?

A. Reject all loads
B. Accept all loads
C. Assess, segregate and manage appropriately under permit conditions ✅
D. Store indefinitely

13. A site receives hazardous waste without correct documentation. What should the operator do?

A. Accept and amend later
B. Reject or quarantine until compliant documentation is provided ✅
C. Mix with other waste
D. Dispose immediately

14. Your site is operating within permitted tonnage, but waste has been stored longer than allowed due to transport delays. What is the main compliance issue?

A. Storage capacity is too low
B. Storage time limits have been exceeded ✅
C. Vehicle movements are too high
D. No issue exists

15. A contractor on site is not following your traffic management plan and is walking through vehicle routes. What should you do?

A. Ignore the behaviour
B. Report it later
C. Intervene immediately and enforce site rules ✅
D. Stop all vehicles permanently

16. A neighbouring business reports litter escaping from your site during high winds. What is the most appropriate response?

A. Ignore the complaint
B. Wait for calmer weather
C. Implement controls such as netting, sheeting and site housekeeping ✅
D. Reduce staffing

17. A site identifies a risk of employees being exposed to hazardous dust during waste processing. Operators are currently issued with disposable masks (PPE), but exposure levels remain high. What is the MOST appropriate improvement in line with the hierarchy of control?

A. Provide upgraded PPE only
B. Increase health surveillance
C. Implement engineering controls such as dust extraction at source ✅
D. Reduce shift lengths only

18. Maintenance is required inside a confined space on site. A risk assessment has already been completed for the task. Why is a permit to work system ALSO required?

A. To replace the risk assessment
B. To provide real-time authorisation and control of a high-risk activity ✅
C. To remove supervision requirements
D. To allow the task to proceed without monitoring